Course syllabus
Course-PM
BOM025 - Construction, Processes and Management lp4 VT23 (7.5 hp)
The course is offered by the Department of Architecture and Civil Engineering as part of MPDCPM.
Welcome to BOM025!
Dear students,
Welcome to Construction, Processes and Management! The course starts on Monday the 20th of March, at 13:15-16:00. We are looking forward to meeting you.
BOM025 will be solely held physically (both for the course sessions and the on-site assignments). However, if we do have to implement any significant changes in the course format down the line due to unprecedented situations or changes in the rules by Chalmers, we will notify you in time.
The course's staff wishes you a successful learning experience. We expect you to carry out practical and theoretical assignments to support your learning. Our aim is to prepare you as professionals who can critically reflect on construction processes, production and management - both on the level of the construction site and on higher managerial strata - while adopting multiple perspectives.
Contact details
Examiner
Dimosthenis Kifokeris (DK), Assistant Professor PhD, Division of Building Design, ACE, dimkif@chalmers.se
Teachers and supervisors
Martine Buser (MB), Associate Professor PhD, Division of Building Design, ACE, buser@chalmers.se
Mikael Viklund Tallgren (MVT), Research Engineer PhD, Division of Construction Management, ACE, mikael.tallgren@chalmers.se
Paula Femenias (PF), Professor PhD, Division of Building Design, ACE, paula.femenias@chalmers.se
Bri Gauger (BG), Postdoc Researcher PhD, Division of Architectural Theory and Methods, ACE, bri.gauger@chalmers.se
Gunnar Wengström (GW), Building Engineer MSc, Educator at YRGO, gunnar.wengstrom@educ.goteborg.se
Invited and guest lecturers
Rasmus Ahlstrand (RAH), Researcher PhD, Department of Sociology, Lund University
Possibly more invited and guest lecturers to be confirmed.
Special expert practitioner guests
Helena Lidelöw, Chief Technical Officer at Volumetric Building Companies
Jan Kohvakka, Manager of Business Development and Innovation at Incoord
Patrik Hakenmyr, Business Developer at Poseidon
Student representatives
Linn Björk Filander linn.bjorkfilander@gmail.com
Gabriella Soumi soumi@student.chalmers.se
Seidpooyan Ghafoori s.pooyan.ghafoori@gmail.com
Rodrigo De Souza rodrigo@rodrigogiorgi.com
Filip de Boer deboerfilip@gmail.com
Course purpose
The construction industry faces a number of major challenges. Those can be either constant (e.g., global competitiveness, global sustainability goals, impacts on the individuals' physical and mental health) or contemporary (e.g., the energy crisis, material shortage). The purpose of this course is therefore twofold: First, develop an understanding of the way construction processes are organized and managed; and second, develop an understanding of the way design and construction companies can implement processes that meet the aforementioned challenges while also minimizing the consumption of resources.
Schedule
BOM025 - Construction, Processes and Management: Course plan (VT2023, Study Period 4: Monday 2023-03-20 to Sunday 2023-06-04)
TimeEdit schedule (timetable below is the most current version)
A minimum of 80%+ of physical attendance at the course sessions is required. Included in this 80% are all the sessions noted as obligatory (O). However, attending more than just the (O) sessions are needed for you to reach that 80%+.
O: Obligatory
Week |
Course day |
Date/time |
Persons |
Topic |
Room |
12 | 1 (O) |
Monday 20 March 13:15 - 16:00 |
DK, MB, MVT |
Session literature: Process perspectives |
SB-H3 |
12 | 2 |
Thursday 23 March 09:00 - 11:45 |
DK |
Session literature: Performance & productivity |
SB-H3 |
13 | 3 |
Monday 27 March 13:15 - 16:00 |
MB, DK |
Session literature: Institutional perspective During weeks 13 and 15, the students are welcome to book supervision meetings for Assignment 1 after consulting with their supervisor |
SB-H3 |
13 | 4 (O) |
Tuesday 28 March 09:00 - 11:45 |
DK, MVT |
Session literature: Lean construction During weeks 13 and 15, the students are welcome to book supervision meetings for Assignment 1 after consulting with their supervisor |
SB-H4 |
13 | 5 (O) |
Thursday 30 March 09:00 - 11:45 |
DK, MB, MVT |
During weeks 13 and 15, the students are welcome to book supervision meetings for Assignment 1 after consulting with their supervisor |
SB-H3 |
15 | 6 |
Thursday 13 April 09:00 - 11:45 |
MVT |
Session literature: Work environment & safety During weeks 13 and 15, the students are welcome to book supervision meetings for Assignment 1 after consulting with their supervisor |
SB-H3 |
16 | 7 (O) |
Tuesday 18 April 09:00 - 16:00 |
DK, MVT, MB |
|
SB-H7 (09:00 - 11:45) SB-H5 (13:15 - 16:00) |
16 | 8 (O) |
Thursday 20 April 09:00 - 11:45 |
RAH, DK |
Session literature: Structures of subcontracting |
SB-H3 |
17 | 9 |
Monday 24 April 13:15 - 16:00 |
MB |
Session literature: Waste management |
SB-H3 |
17 | 10 (O) |
Thursday 27 April 09:00 - 11:45 |
DK |
Session literature: Quality |
SB-H3 |
18 | 11 |
Tuesday 02 May 09:00 - 11:45 |
DK |
Session literature: Corporate & operations strategy |
SB-H4 |
18 | 12 |
Thursday 04 May 09:00 - 11:45 |
DK, MVT, GW |
The students are welcome to also book other supervision meetings for Assignment 2 after consulting with their supervisor |
- |
19 | 13 (O) |
Monday 08 May 13:15 - 16:00 |
DK |
Session literature: Industrialized construction |
SB-H3 |
19 | 14 |
Thursday 11 May 09:00 - 11:45 |
PF, DK |
Session literature: Renovation |
SB-H6 |
20 | 15 (O) |
Monday 15 May 13:15 - 16:00 |
MB, BG, DK |
Session literature: Diversity |
SB-H3 |
21 | 16 (O) |
Tuesday 23 May 09:00 - 16:00 |
DK, GW |
|
SB-H5 |
c
Course literature
The course's literature consists primarily of scientific papers. Most of said literature items are readily available through Chalmers Library, but are also uploaded on the course's Canvas page. The literature items in each Session literature group are divided into mandatory and supplementary (optional) ones. Following a flipped classroom format, the students are expected to have read at least the mandatory items in the corresponding Session literature before each session.
Process perspectives
Mandatory
- Kao, C.C., Green, S., and Larsen, G. (2009). Emergent discourses of construction competitiveness: localized learning and embeddedness. Construction Management and Economics, 27(10), 1005-1017.
- Lundberg, O., Nylén, D., and Sandberg, J. (2022). Unpacking construction site digitalization: the role of incongruence and inconsistency in technological frames. Construction Management and Economics, 40(11-12), 987-1002.
Supplementary
- Chen, X., Chang-Richards, A.Y., Pelosi, A., Jia, Y., Shen, X., Siddiqui, M.K., and Yang, N. (2022). Implementation of technologies in the construction industry: a systematic review. Engineering, Construction and Architectural Management, 29(8), 3181-3209.
- Cho, K., Hong, T. and Hyun, C.T. (2013). Space Zoning Concept-based Scheduling Model for Repetitive Construction Process. Journal of Civil Engineering and Management, 19(3), 409-421.
Performance & productivity
Mandatory
- Bassioni, H., Price, A., and Hassan, T. (2004). Performance Measurement in Construction. Journal of Management in Engineering, 20(2), 42-50.
- Bröchner, J., and Olofsson, T. (2012). Construction productivity measures for innovation projects. Journal of Construction Engineering and Management, 138(5), 670-677.
- Windapo, A., Adediran, A., Rotimi, J.O.B., and Umeokafor, N. (2022). Construction project performance: The role of client knowledge and procurement systems. Journal of Engineering, Design and Technology, 20(5), 1349-1366.
Supplementary
- Beatham, S. Anumba, C., Thorpe, T., and Hedges, I. (2004). KPIs: a critical appraisal of their use in construction. Benchmarking: An International Journal, 11(1), 93-117.
- Bourne, M., Neely, A., Platts, K., and Mills, J. (2002). The success and failure of performance measurement initiatives: perceptions of participating managers. International Journal of Operations & Production Management, 22(11), 1288-1310.
- Crawford, P., and Vogl, B. (2006). Measuring productivity in the construction industry. Building Research & Information, 34(3), 208-219.
- Dubois, A., and Gadde, L.E. (2002). The construction industry as a loosely coupled system: implications for productivity and innovation. Construction Management and Economics, 20(8), 621-631.
- Li, H., Arditi, D., and Wang, Z. (2012). Transaction-related issues and construction project performance. Construction Management and Economics, 30(2), 151-164.
- Neely, A., Gregory, M., and Platts, K. (2005). Performance measurement system design: a literature review and research agenda. International Journal of Operations & Production Management, 25(12), 1228-1263.
Institutional perspective
Mandatory
- Qiu, Y. and Chen, H. (2022). A systematic review of the knowledge domain of institutional theory in construction project management. Engineering, Construction and Architectural Management. DOI: 10.1108/ECAM-08-2021-0754.
Supplementary
- Galea, N., Powell, A., Salignac, F., Chappel, S., and Loosemoore, M. (2022). When following the rules is bad for wellbeing: The effects of gendered rules in the Australian construction industry. Work, Employment and Society, 36(1,) 119-138.
- Jeschke, K.N. (2022). Understanding how managers balance the paradoxical nature of occupational safety through a practice-driven institutional lens. Safety Science, 147, 105627.
- Kadefors, A. (1995). Institutions in building projects: implications for flexibility and change. Scandinavian Journal of Management, 11(4), 395-408.
- Oti-Sarpong, K., Shojaei, R.S., Dakhli, Z., Burgess, G., and Zaki, M. (2022). How countries achieve greater use of offsite manufacturing to build new housing: Identifying typologies through institutional theory. Sustainable Cities and Society, 76, 103403.
- Qiu, Yumin, Chen, H., Sheng, Z. , and Cheng, S. (2019). Governance of institutional complexity in megaproject organizations. International Journal of Project Management, 37(3), 425-443.
Lean construction
Mandatory
- Gao, S., and Low, S.P. (2014). The Toyota Way model: an alternative framework for lean construction. Total Quality Management & Business Excellence, 25(5-6), 664-682.
- Kifokeris, D. (2021). Variants of Swedish lean construction practices reported in research: a systematic literature review and critical analysis. Journal of Construction Engineering and Management, 147(7), 05021005.
- Koskela, L. (2020). Theory of lean construction. In: Tzortzopoulos, P., Kagioglou, M., and Koskela, L. (eds.). Lean construction: Core concepts and new frontiers (1-13). London: Routledge.
Supplementary
- Büchmann-Slorup, R. (2014). Applying critical chain buffer management theory in location-based management. Construction Management and Economics, 32(6), 506-519.
- Green, S., and May, S. (2005). Lean construction: arenas of enactment, models of diffusion and the meaning of ‘leanness’. Building Research and Information, 33(6), 498-511.
- Lohne, J., Torp, O., Andersen, B., Aslesen, S., Bygballe, L., Bølviken, T., Drevland, F., Engebø, A., Fosse, R., Holm, H.T., Hunn, L.K., Kalsaas, B.T., Klakegg, O.J., Knotten, V., Kristensen, K.H., Olsson, N.O.E., Rolstadås, A., Skaar, J., Svalestuen, F., Vaagen, H., Wondimu, P., and Laedre, O. (2022). The emergence of lean construction in the Norwegian AEC industry. Construction Management and Economics, 40(7-8), 585-597.
Work environment & safety
Mandatory
- Grill, M., Pousette, A., Nielsen, K., Grytnes, R, and Törner, M. (2017). Safety leadership at construction sites: the importance of rule-oriented and participative leadership. Scandinavian Journal of Work and Environmental Health, 43(4), 375-384.
- Koch, C. (2013). From crew to country - local and national construction safety cultures on construction sites. Construction Management and Economics, 31(6), 691-703.
- Thörnqvist, C., and Bernhardsson, S. (2015). Their own stories: How Polish construction workers posted to Sweden experience their job situation, or resistance versus life projects. Transfer: European Review of Labour and Research, 21(1), 23–36.
Supplementary
- Baarts, C. (2009). Collective individualism: the informal and emergent dynamics of practising safety in a high‐risk work environment. Construction Management and Economics, 27(10), 949-957.
- Ju, C., and Rowlinson, S. (2014). Institutional determinants of construction safety management strategies of contractors in Hong Kong. Construction Management and Economics, 32(7-8), 725-736.
Structures of subcontracting
Mandatory
- Kahlin, L., Keevallik, L., Söderlundh, H., and Weidner, M. (2022). Translanguaging as a resource for meaning-making at multilingual construction sites. Multilingua, 41(3), 261-280.
- Woolfson, C., Thörnqvist, C., and Sommers, J. (2010). The Swedish model and the future of labour standards after Laval. Industrial Relations Journal, 41(4), 333–350.
Supplementary
- Troje, D. (2023). Social Sustainability in Projects: Using Social Procurement to Create Employment in the Swedish Construction Sector. Project Management Journal, 54(1), 52-69.
Waste management
Mandatory
- Andersson, R., and Buser, M. (2022). From waste to resource management? Construction and demolition waste management through the lens of institutional work. Construction Management and Economics, 40(6), 477-496.
Quality
Mandatory
- Love, P.E.D., Smith, J., Ackermann, F., and Irani, Z. (2018). The praxis of stupidity: an explanation to understand the barriers mitigating rework in construction. Production Planning & Control, 29(13), 1112-1125.
- Koch, C., and Schultz, C.S. (2019). The production of defects in construction – an agency dissonance. Construction Management and Economics, 37(9), 499-512.
Corporate & operations strategy
Mandatory
- Bygballe, L., Håkansson, H., and Jahre, M. (2013). A critical discussion of models for conceptualizing the economic logic of construction. Construction Management and Economics, 31(2), 104-118.
- Koch, C., and Friis, O. (2015). Operations strategy development in project based production – a political process perspective. Journal of Manufacturing Technology Management, 26(5), 501-514.
Supplementary
- Styhre, A., and Josephson, P.E. (2006). Revisiting site manager work: stuck in the middle? Construction Management and Economics, 24(5), 521-528.
Industrialized construction
Mandatory
- Brege, S., Stehn, L., and Nord, T. (2014). Business models in industrialized building of multi-storey houses. Construction Management and Economics, 32(1-2), 208-226.
- Linner, T., Bock, T., (2012). Evolution of large‐scale industrialisation and service innovation in Japanese prefabrication industry. Construction Innovation, 12(2), 156-178.
- Uusitalo, P., and Lavikka, R. (2021). Technology transfer in the construction industry. The Journal of Technology Transfer, 46(5), 1291-1320.
Supplementary
- Meiling, J.H., Sandberg, M., and Johnsson, H. (2014). A study of a plan-do-check-act method used in less industrialized activities: two cases from industrialized housebuilding. Construction Management and Economics, 32(1-2), 109-125.
- Viking, A., and Lidelöw, S. (2015). Exploring industrialized housebuilders’ interpretations of local requirements using institutional logics. Construction Management and Economics, 33(5-6), 484-494.
Renovation
Mandatory
- Ástmarsson, B., Jensen, P.A., and Maslesa, E. (2013). Sustainable renovation of residential buildings and the landlord/tenant dilemma. Energy Policy, 63, 355-362.
- Femenias, P., Jonsdotter, L., Forsemalm, J., Punzi, E., Bogdanova, E., Thodelius, C., and Granath, K. (2019). Residential movements in connection to renovation of rented multi-residential housing: A pilot study. IOP Conference Series: Earth and Environmental Science, 297(1), 1-9.
Diversity
Mandatory
- Tatum, B.D. (2000). The complexity of identity: “Who am I?". In: Adams, M., Blumenfeld, W.J., Hackman, H.W., Zuniga, X., Peters, M.L. (Eds.). Readings for diversity and social justice: An anthology on racism, sexism, anti-semitism, heterosexism, classism and ableism (9-14). New York: Routledge.
- Won, D., Hwang, B.G., and Chng, S.J. (2021). Assessing the effects of workforce diversity on project productivity performance for sustainable workplace in the construction industry. Sustainable Development, 29(2), 398-418.
Supplementary
- Manesh, S.N., Choi, J.O., and Shrestha, P. (2020). Critical literature review on the diversity and inclusion of women and ethnic minorities in construction and civil engineering industry and education. In: Construction Research Congress 2020: Safety, Workforce, and Education (175-184). Reston: American Society of Civil Engineers.
Learning objectives and syllabus
Link to the syllabus on Studieportalen: Study plan (the description below is the most current version)
Learning outcomes
After completion of the course the student should be able to understand and apply theories, concepts and techniques on construction processes, especially during production and with a managerial perspective. This competence includes:
- The ability to identify and select the proper theory and approach to tackle challenges related to construction process, organisation, and management.
- The ability to draw practical insights from theories on, indicatively, human activities in construction processes, other process theories, and lean construction.
- The ability to analyze of the role of site management and project management, and their relationship to complex environments.
- The ability to appraise productivity and performance concepts (their advantages and disadvantages).
Content
The course integrates theoretical approaches with practical cases, with a focus on how construction processes should be led and organized. Key concepts include, but are not limited to:
- Processes
- Management
- Lean construction
- Industrialized construction
- Performance measurement
Organization
The course includes mandatory seminars and presentations, where the Chalmers rules of absense apply. BOM025 consists mainly of the following learning activities:
- Flipped lectures
- Guest lectures from the industry and academia
- Cases, seminars and exercises
- Two group assignments
Examination form
The examination of the course is related to achieving the goals mentioned earlier in the learning outcomes, and is done by two assignments:
- Assignment 1 - Literature seminar: A group work counting for 30% of the final grade. The timeframe for preparing, supervising, and presenting the assignment is noted in the Course schedule above. In particular, the introduction for Assignment 1 will take place on Monday 20/03, the supervision meetings during weeks 13 and 15, the presentation on Tuesday 18/04, and the final submission of the paper on Friday 21/04.
- Assignment 2 - Site study and manager interview: A group work counting for 70% of the final grade. The timeframe for preparing, supervising, and presenting the assignment is noted in the Course schedule above. In particular, the introduction for Assignment 2 will take place on Monday 20/03, the supervision session on Thursday 04/05, the presentation on Tuesday 23/05, and the uploading of the paper on Canvas up until Friday 02/06. After forming groups at the beginning of the course, you will all be appointed to a site manager working at a construction site, in order to work on this assignment.
If there are special reasons for doing so, the course examiner may assess individual students in other ways than what is stated above - e.g. in case a student has acquired a decision from Chalmers on receiving educational support due to disability.
Changes made since the last occasion
The students' assessment from the previous academic year (2021/2022) were taken into thorough account. The course's examiner and staff opted for continuing with the course's content and attributes that gathered a positive feedback (e.g., the partial flipped format in sessions, the literature material), and modified or updated the course content and attributes that received some kind of well-founded criticism (e.g., a clearer explanation of the assignments).
Course summary:
Date | Details | Due |
---|---|---|